Alexandria Home Solutions Logo
Schedule FREE Consultation

ADA Compliance: Door And Window Requirements For Michigan Businesses

October 20, 2025

Key Takeaways

  • Michigan requires power-operated doors beyond federal ADA standards; Assembly occupancies >300 and Business/Mercantile/Hotels >500 must install automatic operators at public entrances ($3,000-$8,000 per door).
  • First-time ADA violations cost $92,383 in 2025; repeat offenses reach $115,231. Hardware swaps ($50-$300) and closer adjustments ($0-$50) provide 300:1+ penalty avoidance ROI.
  • Only 60-70% of U.S. commercial buildings meet ADA standards; proactive compliance creates competitive advantage while eliminating lawsuit exposure and Department of Justice investigations.
  • Michigan winters increase door opening force significantly; quarterly force testing is essential. Smart lock batteries drain 30-50% faster in extreme cold, requiring monthly winter checks.
  • Impact-resistant windows ($35-60/sq ft) reduce break-ins 40-60% and insurance premiums up to 30%; superior security and weather protection with documented 3-5 year payback periods.

Michigan businesses face a unique compliance challenge: meeting federal ADA accessibility standards, specifically the ADA door requirements Michigan enforces; while navigating state-specific enhancements that exceed national requirements. With only 60-70% of U.S. commercial buildings currently compliant and first-violation penalties reaching $92,383 in 2025, understanding door and window regulations is no longer optional; it's essential business infrastructure. 

Michigan's 2021 Building Code adds mandatory power-operated door requirements for high-occupancy facilities, creating obligations that many business owners and facility managers don't yet recognize. Winter weather compounds these challenges, increasing door opening forces and accelerating smart device battery depletion by 30-50%. 

This guide breaks down federal ADA standards, Michigan-specific requirements, and practical implementation strategies to help you achieve full compliance while avoiding costly violations.

What Codes Govern Doors And Windows In Michigan?

Michigan enforces both federal ADA standards and stricter state requirements. The 2010 ADA Standards (§206 for scoping, §404 for technical specs) establish baseline accessibility. The Michigan Building Code 2021 (effective April 9, 2025) adopts ICC A117.1-2017 and adds power-operated door mandates for specific occupancy types.

Code Authority Quick Reference

RequirementADA 2010MBC 2021Key Difference
Clear opening width32" minSameIdentical
Door hardwareLever, 34"-48" highSameIdentical
Opening force5 lbs interior maxSame (fire doors may exceed)MBC allows fire door exception
Power-operated doorsNot requiredRequired: Assembly >300; Business/Mercantile/R-1 >500Michigan enhancement
Maneuvering clearances18" pull side, 12" push (front approach)SameIdentical
Thresholds1/2" max; 3/4" altered w/bevelSameIdentical

Michigan Power-Operated Door Rule (§1105.1.1): Assembly occupancies (A-1 through A-4) exceeding 300 occupants and Business/Mercantile/Hotel facilities exceeding 500 occupants must install power-operated doors at public entrances. Vestibules require one powered door for entry and one for exit. Installation costs range $3,000-$8,000 per door.

Who Must Comply And When?

New Construction: All public entrances and interior doors on accessible routes must meet full §404 specifications. Power-operated requirements trigger immediately when occupant loads exceed thresholds.

Alterations: Door replacement on any accessible route requires full compliance; no "in-kind" exemption exists. IEBC Level 2 renovations mandate compliant new/altered doors. Level 3 (major renovations) triggers full building compliance plus 20% path-of-travel improvements. Common triggers include retail stores (>500 occupants), restaurants/bars (>300 occupants), office buildings (>500 occupants), and hotel amenities.

Core ADA Door Requirements For Michigan

These fundamentals drive commercial door accessibility for offices, retail, hotels, and medical facilities.

  • Clear Opening Width: 32" minimum, measured at 90° from door face to opposite stop. Openings deeper than 24" require 36" clear width. Measure the actual opening, not the door leaf. A 36" door does not provide 36" clear space.
  • Maneuvering Clearances: Front approach pull side needs 60" deep × 48" wide space with 18" beyond latch. Push side requires 48" deep × 48" wide (12" beyond latch, 0" with closer). Vestibules must accommodate clearances for both doors simultaneously.
  • Thresholds: 1/2" maximum height (3/4" for altered openings with bevels on both sides). These entry threshold guidelines are easy to miss; Michigan ice buildup effectively increases threshold height, so winter maintenance is compliance-critical.
  • Opening Force: 5 lbs maximum for interior doors. Exterior doors have no ADA force limit, but Michigan winters increase the required force substantially. Automatic operators are strongly recommended for exterior access.
  • Hardware Specifications: Use accessible hardware levers; no round knobs. Mount 34"-48" above finished floor. One-hand operation without tight grasping, pinching, or twisting.
  • Closer Timing: Minimum 5 seconds from 90° to 12° from latch. Cold temperatures slow hydraulic closers; seasonal rechecking prevents violations.

Where Automatic Operators Are Critical

Michigan MBC §1105.1.1 Mandates: Assembly occupancies exceeding 300 occupants and Business/Mercantile/Hotel facilities exceeding 500 occupants must install power-operated doors. No exceptions.

Beyond Code; Practical Necessities: Heavy exterior doors exceeding 5 lbs due to wind pressure or snow accumulation functionally violate the ADA regardless of code exemptions. Great Lakes wind exposure and frequent ice conditions make automatic operators essential for true accessibility. Winter weather transforms code-compliant manual doors into barriers.

Glazing And Safety Requirements

Hazardous Location Rules: Glazing within doors always requires safety glazing meeting CPSC 16 CFR 1201. Glass within 24" of door edges needs safety treatment if the bottom edge sits below 60" and the panel exceeds 9 sq ft. Glass adjacent to walking surfaces requires safety glazing when bottom edges measure below 18". Permanent labels documenting compliance are mandatory.

Michigan Weather Upgrades: Impact-resistant windows meeting ASTM E1996 reduce break-ins by 40-60% while withstanding severe weather. Laminated glass with SGP interlayers ($35-60/sq ft) outperforms standard tempered glass ($12-20/sq ft) for security and durability. Insurance carriers offer up to 30% premium reductions for certified installations, offsetting higher material costs within 3-5 years.

Transaction And Service Windows

Accessible Counter Specifications (ADA window considerations): Mount transaction surfaces 28"-34" above finished floor. Provide knee clearance measuring 27" high × 30" wide × 17" deep underneath. Position pass-through openings within 15"-48" reach range. Alternative compliance: staff approach customers at an accessible counter section.

Vision Panel Best Practices: Bottom edges at 43" maximum accommodate seated users. Top edges at 66" minimum serve standing customers. While optional under ADA, vision panels significantly improve safety and customer experience, particularly valuable in medical, government, and financial facilities.

Common Michigan Compliance Mistakes

Top Five Failures:

  1. Narrow Clear Openings: Measuring door leaf width instead of actual clear opening at 90°. Hinge backplates reduce clearance by 1"-2". Widening existing openings costs $2,000-$5,000 per location.
  2. Round Doorknobs: Non-compliant hardware triggers the $92,383 penalty. Lever replacement costs $50-$300 per door; immediate ROI through violation avoidance.
  3. Excessive Opening Force: Michigan winters increase door resistance beyond 5 lbs. Closer adjustments cost $0-$50. Power operators run $3,000-$8,000 but eliminate force issues permanently.
  4. Inadequate Maneuvering Clearances: Vestibule mats, furniture, and seasonal displays block the required space. Repositioning costs nothing. Structural vestibule redesigns reach $5,000-$15,000.
  5. Missing Safety Glazing Labels: Sidelites and door glass lack permanent CPSC 16 CFR 1201 certification marks. Replacement with labeled safety glazing is required if documentation cannot prove compliance.

7-Step Compliance Checklist For Michigan Businesses

Systematic audits prevent violations before they trigger penalties. This checklist addresses federal ADA requirements plus Michigan-specific enhancements. Complete all seven steps quarterly; seasonal changes affect door performance significantly.

Step 1: Verify Accessible Route: Confirm 36" continuous width from accessible parking to entrance. Slope cannot exceed 5%. Document winter snow removal protocols; accumulated snow creates functional barriers regardless of summer compliance.

Step 2: Check Entrance Doors: Measure clear opening at 90° (not door leaf width). Verify power-operated installation if Assembly occupancy exceeds 300 or Business/Mercantile/R-1 exceeds 500 occupants.

Step 3: Measure Maneuvering Clearances: Pull side requires 60" deep × 48" wide space with 18" extending beyond latch side. Push side needs 48" deep × 48" wide (12" beyond latch). Vestibules must accommodate clearances for both doors simultaneously; seasonal mats and displays frequently violate this requirement.

Step 4: Test Forces and Timing: Interior doors must open with 5 lbs force maximum. Closer timing requires minimum 5 seconds from 90° to 12° from latch. Recheck quarterly; cold temperatures stiffen hydraulic closers and increase resistance dramatically.

Step 5: Verify Hardware: Confirm lever handles (no round knobs) mounted 34"-48" above finished floor. Test one-hand operation without tight grasping, pinching, or twisting wrists.

Step 6: Inspect Thresholds and Glazing: Thresholds cannot exceed 1/2" height (3/4" for altered openings with bevels). Verify permanent CPSC 16 CFR 1201 labels on all glazing in hazardous locations.

Step 7: Document and Maintain: Photograph compliant installations with date stamps. Record force and timing test results. Increase inspection frequency to weekly during the active snow season.

Special Michigan Considerations

Historic Buildings: Qualified historic exceptions (ADA §202.5) permit alternative compliance methods when modifications would threaten historic character. Accessible alternate entrances with clear directional signage satisfy requirements. Consult State Historic Preservation Office (SHPO) before proceeding; federal tax credits may depend on approved approaches.

Multi-Tenant Centers: Landlords control common entrances, accessible routes, and building-level power-operated doors. Tenants manage suite entrances and interior doors. Written agreements must specify snow removal and maintenance responsibilities. Ambiguity creates liability gaps.

Winter-Specific Issues: Snow storage must maintain 36" clear width on accessible routes; not just shovel to the side. Ice management requires heated mats or frequent chemical treatment. Battery-powered smart locks drain 30-50% faster in extreme cold; check monthly during winter. Retest door forces after every significant temperature drop.

Priority Action Plan

Immediate (Low-Cost, High-Impact):

  1. Hardware Swaps: Replace round knobs with levers. Cost: $50-$300 per door. ROI: Immediate through $92,383 penalty avoidance.
  2. Closer Adjustments: Reduce opening force to 5 lbs maximum. Cost: $0-$50 per door. Results in 15 minutes.
  3. Safety Glazing Label Verification: Inspection costs nothing. Missing labels require replacement; document existing compliance first.

Short-Term (Moderate Cost):

  1. Threshold Corrections: Bevel or replace non-compliant thresholds. Cost: $50-$200 each.
  2. Power Operator Installation: Required for trigger occupancies. Cost: $3,000-$8,000. Michigan enhancement; non-negotiable when thresholds exceeded.
  3. Vision Panel Additions: Improve safety and customer experience. Cost: $200-$500 per panel. Particularly valuable in medical and government facilities.

Long-Term (Major Investment):

  1. Vestibule Redesign: Required when clearances cannot be achieved. Cost: $5,000-$15,000. Complex but occasionally unavoidable.
  2. Door Widening: Structural modifications for 32" clear openings. Cost: $2,000-$5,000 per opening. Coordinate with renovation schedules when possible.
  3. Impact-Resistant Windows: Cost: $35-60/sq ft. Payback: 30% insurance savings plus 40-60% break-in reduction. Reinforced steel entry doors achieve 100% cost recovery on resale.

When To Call For Help

Call Accessibility Consultant: Building official disputes compliance interpretation. Historic building modifications require SHPO coordination. Vestibule redesign exceeds in-house capabilities. Major alterations trigger 20% path-of-travel improvements; professional guidance prevents costly errors.

Call Door Technician: Opening force remains above 5 lbs after closer adjustments. Automatic operators malfunction or fail seasonal performance tests. Repeated winter issues indicate equipment inadequacy for the climate.

Call Attorney: ADA complaint or demand letter received. DOJ investigation initiated. Private lawsuit filed. Early legal intervention significantly reduces settlement costs and compliance timelines.

Frequently Asked Questions

Can revolving doors serve as the only entrance? 

No. Adjacent swinging or automatic doors meeting full §404 requirements are mandatory. If occupancy triggers Michigan's power-operated requirement, the adjacent door must be automatic, not just manual.

Do automatic doors always comply with ADA?

Not automatically. Verify: manual mode operates with ≤5 lbs force, proper sensor detection zones, battery backup functionality, and ≥5-second dwell time. Installation alone does not guarantee compliance.

How do Michigan winters affect compliance? 

Wind pressure and snow accumulation increase the opening force substantially. Power operators are strongly recommended for all exterior doors regardless of occupancy thresholds. Quarterly force retesting is essential; seasonal temperature swings alter closer performance. Smart lock batteries drain 30-50% faster in extreme cold; monthly winter checks prevent lockouts.

Are drive-through windows required to be pedestrian-accessible? 

No pedestrian access required, but equivalent service must be available via call button to interior staff, walk-up window, or documented curbside pickup protocol.

Practical Takeaway For Michigan ADA Compliance

Focus first on the accessible route and entrance (36" clear width and reliable snow/ice removal), then meet Michigan’s power-operator mandates where occupancy thresholds apply. Swap round knobs for lever hardware, verify door forces and closer timing quarterly, especially in winter, and confirm safety glazing labels at hazardous locations. Budget 2–5% of annual maintenance for accessibility, bundling upgrades with planned renovations to cut costs. 

These targeted steps, often as simple as a $300 lever swap, help avoid first-violation penalties of $92,383, while larger investments like automatic operators and impact-resistant glazing pay back through risk reduction and insurance savings.

Ready to ensure your facility meets Michigan's door and window accessibility requirements? Contact Alexandria Home Solutions for a professional compliance assessment and implementation plan tailored to your business.

Alexandria Home Solutions is a luxury remodeling company offering full service replacement of windows, doors, roofing, siding, and decking. Serving the counties of Oakland, Wayne, Macomb, Washtenaw, Livingston, St. Clair, Michigan.
Related Articles
Siding Selection 101: A Comprehensive Guide to Choosing the Right Siding for Your Home
The exterior of your home is its first impression, and choosing the right siding is crucial for both aesthetics and…
Vinyl Siding Near Me: Affordable and Durable Solutions
Transform the look and durability of your home with premium vinyl siding near me. Alexandria Home Solutions offers a range…
A Memorial Day Reflection
Strengthening Our Homes and Communities Just as these heroes have built a legacy of protection and security for our nation,…
Easy Steps for Installing an Interior Door
Key Takeaways: Replacing or installing an interior door can dramatically change the look and feel of a room, providing both…
Improve Your Home’s Exterior by Installing Vinyl Siding
At Alexandria Home Solutions, we specialize in installing vinyl siding that enhances the appearance, durability, and energy efficiency of your…
Start your project
Request A Quote
Our experts are here to help you plan your next home renovation project. Book a free consultation today to discuss your ideas, explore possibilities, and get professional advice tailored to your style and budget.
Alexandria Home Solutions Logo
24293 Telegraph Rd #180, 
Southfield, MI 48033
© 2025 Alexandria Home Solutions. All Rights Reserved.
phone-handsetcalendar-fullcross